The concrete mixer consists of a mixer, a drive system, a feeding system, a water supply system, a rack and a leg, an electrical control system, and a stirrer, a stirrer, a shaft end seal, a liner, a discharge door lubrication system, Hongbin company to come for everyone to summarize the structure of concrete mixer structure, for your reference.
Concrete mixer composition structure:
(1) Stirring device:
Mixing cylinder, stirring shaft, stirring arm, stirring blade and side blade. The stirring cylinder is equipped with two horizontal configuration mixing shaft, each shaft is equipped with stirring blades. The mixing blades on both ends of the mixing cylinder are respectively provided with side blades to scrape off the concrete on the end face and change the flow of concrete.
(2) Drive system:
Transmission mode by transmission can be divided into two kinds: respectively, mechanical transmission and hydraulic drive. Hydraulic drive has a light weight, small size, tight structure, driving force and other characteristics, but taking into account the current domestic situation, although the hydraulic motor than in the past to improve the quality, but expensive, for the general cost of the mixer is too high, Not economical, so we use the traditional mechanical transmission. Transmission system consists of motor, pulley, gear box, open gear and other components.
(3) feeding system:
The feeding system consists of hoisting mechanism, feeding rack, hopper, feed hopper, pulley and so on
(4) Water supply system:
Water supply system is the motor, water pump, throttle and piping and other components. Start the pump, you can inject the mixing cylinder, the flow of water through the gate valve regulation, the total water supply by the time relay control. When the button goes to "time control"
Position, the pump will run according to the set time and automatically stop, when the button to "manual" position, can be continuous water supply.
(5) Rack and legs:
① rack:
According to the overall layout and size requirements, according to the overall requirements of the specific requirements of the channel, angle welded together, and according to the strength of the assembly welding riveting together, support the host, and the various parts of the spatial position fixed to form a whole.
② Outrigger: Due to the large capacity of the machine, according to the national urban construction regulations require discharge height greater than 1.5m, with long legs with the use. Stirring long legs support to meet the requirements. The legs can be removed during transport. Short legs are used for transport status,
Removing the long legs prevents the components of the rack from being damaged by contact with the vehicle.
(6) Electrical control system:
The electrical control system needs to control the main drive motor of the JS750 concrete mixer, the motor of the water supply system, the feeding, the cutting and the like. All electrical control components are located in the distribution box. Electrical components control to meet the requirements: the main motor can be jog to meet the installation and repair process requirements. Electrical control circuit with air switch, fuse, thermal relay with short circuit protection, overload protection, phase protection function, all control buttons and air switch handle and indicator lights are arranged in the distribution box door, and a door lock The Distribution box electrical components installed in a piece of iron, safe and reliable, easy operation and maintenance.
www.t-batching-plant.com
2017年6月15日星期四
2017年6月14日星期三
Concrete mixing plant can not operate irregularly
1), easy to damage the stability of the host, affecting the concrete mixing plant host security. The host has always been the core control part of the entire mixing station system, a minor modification to any of its parameters may affect the production of the entire mixing station. Serious illegal operation may cause host safety to be affected. There have been due to illegal operation of the cause of the entire concrete mixing plant host system paralyzed the phenomenon. Therefore, the Fulaier machinery to remind our customers, the host operation is very important, we must use professional and technical personnel in accordance with the relevant process reasonable and standardized operation, encountered special circumstances should also consult the professional staff or equipment manufacturers with the mixing station, and Do not be free to operate.
2), easy to damage the mixing station weighing system. To commercial concrete mixing plant, for example, the material and moisture weighing accuracy is very high, if non-professional staff free operation lead to important material and moisture does not meet the requirements, it is prone to heavy material caused by weighing system Damage, and material leakage damage to the weighing system of the phenomenon of the sensor, thus affecting the mix of the entire commodity concrete, and ultimately lead to the subsequent production of concrete products are not up to standard. Therefore, the Fulaier machinery recommended concrete mixing station weighing system operation must hire professional laboratory personnel to operate, not to arbitrarily change, adjust the data has been set up.
3), easily lead to stirring the host of the fault. For different nature, different weight, different mix of materials, mixing, mixing the host in some important parameter settings such as mixing time, stirring speed and other requirements are very different, if you arbitrarily change the parameters of these mixing host, there will be Stirring speed too fast lead to damage to the mixing shaft, stirring too long lead to damage caused by the phenomenon of agitation shaft. Therefore, the operation of the mixing console must ensure that the professional and technical personnel responsible.
4), easy to damage the stability of cement storage materials. For concrete products that have been produced for compliance, they need to be stored in different tons of bulk cement ware or sheet-like cement warehouses. But in the storage process must pay attention to the speed of the material, and the feed port, the discharge port is blocked, the top of the cement warehouse cleaning operations, etc., these are the need for professional staff to carry out the operation to complete , If the operation by the non-professionals at random, it is easy to appear in the mouth of the mouth, the top of the cement warehouse because of excessive damage to the concrete ash and other cement storage material stability of the phenomenon.
2017年6月13日星期二
The working principle of concrete mixing plant
On how the concrete mixing plant is working, many people think that the relevant raw materials Tim to participate in concrete mixing plant, mixing with concrete mixing station used to complete.
The concrete used in the concrete mixing plant is a building material that is used on a global scale, its strength, durability, and low cost. Material, so that it is readily available. One of the specific drawbacks is that it is broadly that the concrete mix must be in the field or within a reasonable interval of a specific batch mixer. When the concrete is a mixture of cement, water, sand and gravel, the resulting material is reacted.
This wide range of building materials between the cement mixture and the water molecules is exothermic. The cement is made of damaged alumina, silica, lime, iron oxide, and magnesium oxide, which has been heated to the sintering temperature at which the surface tension is reduced and the particles are intertwined. Precision, product powder easy to react with the occurrence of water products. Mixed with the same, directly related to the quality of concrete products.
The concrete mixing station takes the water as a concrete to the concrete batch mixer, the cement is active as a paste, and finally the batter-like compound and a mixture of rocks, sand and gravel. The mixture, now called the concrete collaboration ratio, will set a reaction that is not reversible. In the process, once the water to participate, is not blocked until finished. The concrete is generally packed and poured into three to seven hours.
www.t-batching-plant.com
The concrete used in the concrete mixing plant is a building material that is used on a global scale, its strength, durability, and low cost. Material, so that it is readily available. One of the specific drawbacks is that it is broadly that the concrete mix must be in the field or within a reasonable interval of a specific batch mixer. When the concrete is a mixture of cement, water, sand and gravel, the resulting material is reacted.
This wide range of building materials between the cement mixture and the water molecules is exothermic. The cement is made of damaged alumina, silica, lime, iron oxide, and magnesium oxide, which has been heated to the sintering temperature at which the surface tension is reduced and the particles are intertwined. Precision, product powder easy to react with the occurrence of water products. Mixed with the same, directly related to the quality of concrete products.
The concrete mixing station takes the water as a concrete to the concrete batch mixer, the cement is active as a paste, and finally the batter-like compound and a mixture of rocks, sand and gravel. The mixture, now called the concrete collaboration ratio, will set a reaction that is not reversible. In the process, once the water to participate, is not blocked until finished. The concrete is generally packed and poured into three to seven hours.
www.t-batching-plant.com
2017年6月8日星期四
The structure of concrete batching machine
The concrete batching machine is mainly used in the concrete construction industry to replace the artificial platform scale or volumetric measurement, etc., with high measurement accuracy, high distribution efficiency, high degree of automation.
1, the feeding system: from the hopper and feeding device, the main function is to store the material and in the control system under the control, to the hopper feeding. Feeding system in the form of: PLD800-1200 type, for the belt machine feeding;
2, weighing system: weighing system is a key part of the ingredients, by the hopper, suspension and weighing system sensors, ingredients control instrument and other components.
3, electrical control system: electrical control system is the core components of the ingredients, its function is to achieve the entire batching machine weighing, display, operation and complete a variety of automatic batching procedures. The system consists of two parts: the batching controller and the strong electric circuit.
www.t-batching-plant.com
1, the feeding system: from the hopper and feeding device, the main function is to store the material and in the control system under the control, to the hopper feeding. Feeding system in the form of: PLD800-1200 type, for the belt machine feeding;
2, weighing system: weighing system is a key part of the ingredients, by the hopper, suspension and weighing system sensors, ingredients control instrument and other components.
3, electrical control system: electrical control system is the core components of the ingredients, its function is to achieve the entire batching machine weighing, display, operation and complete a variety of automatic batching procedures. The system consists of two parts: the batching controller and the strong electric circuit.
www.t-batching-plant.com
2017年6月7日星期三
How to buy stable soil mixing plant
Buy stable soil mixing plant to consider what issues into it?
First, through the stability of the soil mixing station construction concrete performance label to choose what kind of mixing host. Such as water conservancy projects must be used to force the mixing console. In addition, should also be based on the type of concrete can be mixed with optional ingredients and storage silos.
Second, through the construction of concrete task and its duration to do the parameters to choose how much of the mixing station. The total working capacity of concrete is M; the number of days of concrete pouring is T; the number of working hours per day is H; if the coefficient is K, the stable soil mixing station should use the specifications of the mixing station X = M / T * H * K, 0.7-0.9. In the selection also consider the transport of finished concrete. Such as: direct pumping or vehicle delivery. The volume of the delivery vehicle is also an important basis for determining the type of mixing station.
Third, the construction environment and construction targets; in the choice of the purchase of stable soil mixing station, the stability of the soil mixing plant should take full account of the construction and construction of the environment, so as to ensure the smooth construction and construction quality.
www.t-batching-plant.com
First, through the stability of the soil mixing station construction concrete performance label to choose what kind of mixing host. Such as water conservancy projects must be used to force the mixing console. In addition, should also be based on the type of concrete can be mixed with optional ingredients and storage silos.
Second, through the construction of concrete task and its duration to do the parameters to choose how much of the mixing station. The total working capacity of concrete is M; the number of days of concrete pouring is T; the number of working hours per day is H; if the coefficient is K, the stable soil mixing station should use the specifications of the mixing station X = M / T * H * K, 0.7-0.9. In the selection also consider the transport of finished concrete. Such as: direct pumping or vehicle delivery. The volume of the delivery vehicle is also an important basis for determining the type of mixing station.
Third, the construction environment and construction targets; in the choice of the purchase of stable soil mixing station, the stability of the soil mixing plant should take full account of the construction and construction of the environment, so as to ensure the smooth construction and construction quality.
www.t-batching-plant.com
2017年6月6日星期二
Concrete mixing plant leakage how to deal with
Concrete mixing plant as a production of concrete mixing equipment, is the road construction, construction of indispensable mixing equipment, its safe and smooth operation is related to the progress of the entire project and the safety of construction workers. But any kind of machinery and equipment in the course of the operation will inevitably encounter some unexpected events, including power, leakage, damage to parts and so on, for concrete mixing station such a large equipment, the leakage phenomenon has occurred , Once the problem, how to solve it?
1, to determine whether the line is really leakage.
You can use the megger to shake the size of the line insulation resistance, or in the total knife gate connected to a ammeter, without opening the equipment under the premise of all the mixing station equipment, if the ammeter pointer swing, then the line leakage.
2, to determine the phase line and zero line leakage or phase line and earth leakage, or both. If the ammeter indication is zero, it is between the phase line and the zero line leakage; if the ammeter indication becomes smaller but not zero, then the current meter indication is zero, Said both.
3, determine the leakage range.
Remove the split fuse or pull the knife, if the ammeter indicates the same, it is the bus leakage; if the ammeter indicates zero, it is shunt leakage; if the ammeter indication becomes smaller but not zero, then the bus, Road are leakage.
4, find the leakage point.
After the inspection of the above concrete mixing station line, and then opened the switch in turn the line lamps. When a switch is opened, if the ammeter indicates zero return, it is the branch line leakage, if the ammeter indication becomes smaller, then that in addition to the branch line leakage, there are other leakage. Or use the pencil test can also be used. In turn to narrow the scope of the search, you can find the leakage point.
www.t-batching-plant.com
1, to determine whether the line is really leakage.
You can use the megger to shake the size of the line insulation resistance, or in the total knife gate connected to a ammeter, without opening the equipment under the premise of all the mixing station equipment, if the ammeter pointer swing, then the line leakage.
2, to determine the phase line and zero line leakage or phase line and earth leakage, or both. If the ammeter indication is zero, it is between the phase line and the zero line leakage; if the ammeter indication becomes smaller but not zero, then the current meter indication is zero, Said both.
3, determine the leakage range.
Remove the split fuse or pull the knife, if the ammeter indicates the same, it is the bus leakage; if the ammeter indicates zero, it is shunt leakage; if the ammeter indication becomes smaller but not zero, then the bus, Road are leakage.
4, find the leakage point.
After the inspection of the above concrete mixing station line, and then opened the switch in turn the line lamps. When a switch is opened, if the ammeter indicates zero return, it is the branch line leakage, if the ammeter indication becomes smaller, then that in addition to the branch line leakage, there are other leakage. Or use the pencil test can also be used. In turn to narrow the scope of the search, you can find the leakage point.
www.t-batching-plant.com
2017年6月5日星期一
The operation flow of concrete mixing plant
Concrete mixing plant is a large-scale construction machinery and equipment, is built by a large number of mechanical equipment, so the correct operation of the concrete mixing station is very important, led by moving the whole body is also the case, every mechanical equipment After the shutdown and shutdown of these two processes, although the two simple operation, but it is related to the entire production and the end of the equipment, so we must follow the correct operating procedures.
Concrete mixing station correct start process: the first choice to open the water valve switch to the pump water, followed by air compressor open storage warehouse door, and then open the discharge belt, open the mixing host, feeding belt machine and batching machine, and finally open the water switch The
Concrete mixing station correct shutdown process: first off the dosing machine, water supply switch, feeding switch (to ensure that no material on the hopper) followed by closing the mixing console, unloading belt switch machine storage door and air compressor off. Finally, clean the mixing cylinder to turn off the water switch switch level of the total power of the switch can be.
Reasonable and reasonable switch concrete mixing station is to ensure the normal operation of the premise of the equipment, so no matter the size of the points, we must correctly improve each production steps.
www.t-batching-plant.com
2017年6月2日星期五
Maintenance of concrete mixers
Mixer as the core of the concrete mixing plant, the smooth operation of the mixing station determines the stability of the operation.
1, each class to check the concrete mixing plant shaft seal chamber, distributor inlet and outlet and sealing pipe is smooth, whether full of grease, the lubrication point and slow down the box whether there is enough oil (grease).
2, each class observation of the concrete mixing station of the electric lubrication pump oil tank is running out of oil, close to run out in time to fill, do not allow oil-free operation.
3, each class work must be fully cleaned up the concrete mixing station inside and outside the mixing tank, unloading doors and other materials, and rinse with water, rinse the adhesive material should be chiseled regularly.
4, the mixing of the mixing station must be tightened once a week to prevent the blade off the cause of the accident.
Maintenance of concrete mixers
www.t-batching-plant.com
1, each class to check the concrete mixing plant shaft seal chamber, distributor inlet and outlet and sealing pipe is smooth, whether full of grease, the lubrication point and slow down the box whether there is enough oil (grease).
2, each class observation of the concrete mixing station of the electric lubrication pump oil tank is running out of oil, close to run out in time to fill, do not allow oil-free operation.
3, each class work must be fully cleaned up the concrete mixing station inside and outside the mixing tank, unloading doors and other materials, and rinse with water, rinse the adhesive material should be chiseled regularly.
4, the mixing of the mixing station must be tightened once a week to prevent the blade off the cause of the accident.
Maintenance of concrete mixers
www.t-batching-plant.com
2017年6月1日星期四
The quality of the concrete mixing station is checked
First, the first is from the falling mixer of the concrete mixer, the discharge ring radial runout can not exceed 1% of the diameter of the inlet. In addition, we must also check the concrete mixer on the vibrating screen mesh steel quality, mesh and sieve size is reasonable, as well as the installation of the screen accuracy.
Second, followed by the operation of the transmission system to be flexible, no abnormal sound.
Third, followed by belt conveyor, bucket elevator and cantilever drags and other transmission to be smooth, flexible operation, the brake can be high, no abnormal noise, no card chain.
Four, followed by the metering system. To check the sensitivity and accuracy of the metering system.
Fifth, in addition, the reducer to raise the temperature should also pay attention to, to achieve the temperature on the qualified book.
Six, and then measure the bucket into the material to be smooth, can not appear accumulation, flashing and so on.
Seven, the safety valve can not appear leak phenomenon.
8, the quality of cement tanks to be qualified.
Nine, supporting the installation of the line should be reasonable, the equipment installed to be correct.
www.t-batching-plant.com
Second, followed by the operation of the transmission system to be flexible, no abnormal sound.
Third, followed by belt conveyor, bucket elevator and cantilever drags and other transmission to be smooth, flexible operation, the brake can be high, no abnormal noise, no card chain.
Four, followed by the metering system. To check the sensitivity and accuracy of the metering system.
Fifth, in addition, the reducer to raise the temperature should also pay attention to, to achieve the temperature on the qualified book.
Six, and then measure the bucket into the material to be smooth, can not appear accumulation, flashing and so on.
Seven, the safety valve can not appear leak phenomenon.
8, the quality of cement tanks to be qualified.
Nine, supporting the installation of the line should be reasonable, the equipment installed to be correct.
www.t-batching-plant.com
订阅:
博文 (Atom)