2017年5月24日星期三

Application of concrete mixer

Concrete mixer project construction has played a significant role. It can also be applied to many other constructions. Therefore, it must adapt to the needs of the terrain conditions, according to the different requirements of the design of the machine and its components, which is very important machine technology functions are: modify, add and expand, the automation system should have a high degree of flexibility.
1. Mixer
Control system to ensure safe and reliable task is to provoke the operation, which is mainly motor and mixer closed-loop control mechanism, covering the mixing tank indirect drive control is also necessary. Today, most mixers are consistent, and in addition, the measuring device used to measure humidity in the system is equipped with a microwave sensor and a temperature sensor
2. Concrete management
Concrete management equipment, including concrete silos, concrete metering, said components controlled by the inverter spiral. A metering or radar sensor used to measure the material of a silo. In order to avoid a lot of dust, concrete mixer, must also be equipped with air filters, vibration principle, the use of dust in the air automatically deleted. In addition, the use of sensors can also protect the silo, to avoid excessive pressure on the warehouse.
3. Transport sand
In the unloading of sand or by the strain sensor in the conveyor belt sliding. If you are using gravel cars, they are controlled by the inverter, terminal position sensor and safety terminal position sensor. The sand bin consists of one to two vibrators that ensure accurate packaging material. In demanding applications, silos are measured by radar sensors. If necessary, you can also use the radar sensor to measure the moisture in the sand. Therefore, the concrete mixing process obtained in the measurement data collection.
4. Measure the amount of water
First with two control valves weighing by weighing, and then use a parallel flow meter more accurate measurement.
5. Add the accessories
Concrete is produced according to the specific requirements of different applications, so its characteristics are not the same. Today, it is hard to imagine that no ingredients are added to the concrete production process. These auxiliary materials are mainly supplemented by pumps and metering. The following are the same as the.
www.t-batching-plant.com

2017年5月22日星期一

Maintenance of concrete mixing plant

Maintenance of concrete mixing plant
1, see the smooth oil within the blender oil cups.
2, once a week to see the oil mist of a high degree of timely filling.
3, once a day, open the water valve, the air compressor and gas tank condensed water discharged.
4, some bolts and nuts should always check is not loose, timely tightening.
5, water supply, gas, admixture system and the equipment is not normal.
6, check the electrical control system and the instrument is not normal.
7, see the concrete mixer of the mixing shaft and simplified cleaning is not clean. If the agglomeration of the agglomeration of concrete too much, it is necessary to manually enter the finishing.
8, regular finishing may change the cement warehouse filter in the filter.
9, regular finishing the host dust pipe in the residual powder, to prevent blocking.
www.t-batching-plant.com

2017年5月19日星期五

Concrete mixer which accessories

Concrete mixer is divided into general mixer and forced mixer, the current project are used in the mandatory, the difference is the former is the shell in the turn, which is inside the stirring. Mandatory mixer commonly used accessories are: lifting bucket wheel, stirring arm, leaves, hopper limiter, liner. Usually mixing arm, leaves, lining for the wearing parts, in the construction should be replaced.

(Pulse), filter (triangle), siren warning lights, red hose (soft pipe), the flow of liquid, the use of high- (Inlet), the host wind pressure solenoid valve * (domestic), the regulator, the host of the air pressure solenoid valve (inlet), the host air pressure solenoid valve * (domestic), the regulator Dust filter, air compressor filter, discharge door signal switch, electronic control valve, cutting ring glasses board, gate valve assembly around, wear-resistant strip, wear-resistant round, wheel, shaft head shell, Wait.
www.t-batching-plant.com

2017年5月18日星期四

Safety of the concrete mixer steps

1, the concrete mixer should be installed in a solid flat on the ground, to prevent dumping due to ground subsidence.
2, in the use of operations, should be clean, fastening, lubrication, adjustment, anti-corrosion procedures to check the machine system, and to meet the requirements; accident hidden trouble must be eliminated.
3, power-driven mixer, power distribution equipment should be installed appropriate fuse and grounding device to ensure the safety of electrical systems.
4, the mixer is running, do not let the gravel into the mechanical part of the operation, to avoid the parts were stuck and damaged.
5, after the hopper lifted, the hopper is strictly prohibited by someone or stay, such as must be under the maintenance of the bucket should be shut down to cut off the power, and the hopper hanging with the insurance chain after the prospective. Feed hopper should be slowly put down, so as not to fall too fast, damaged parts or failure.
6, before the discharge can not be no reason to stop, but can not start feeding after feeding, feeding capacity can not exceed the specified capacity.
7, before the hopper is not stopped before the feed.
8, the mixer body must be installed firmly solid. Should be checked before the work of the clutch and the brake is flexible and reliable, whether the wire rope broken wire damage, the protection device is complete and reliable, and test run; such as stirring cylinder rotation smooth, not beating, not deviation, hopper up and down the door and flexible, Hoop under the cam mechanism is normal before they can work. Prohibit the use of overload; mechanical operation prohibited by hand or other objects into the mixing tube to fiddle, cleaning and repair work.
9, when the mixer full load operation in the event of a sudden power failure or failure, the application of human mixing cartridge material will be cleared, and then check or repair. Do not allow the full load to start the mixer, to prevent the current is too large and damage the motor.
10, the operator must enter the mixing tube for cleaning or maintenance, should strictly control the power to prevent accidents.
11, after the end of mixing work, to clean the mixer in time to prevent concrete agglomeration. When cleaning, to prevent electrical equipment damp. The cleaning work must be carried out after power failure to prevent electric shock
www.t-batching-plant.com

2017年5月17日星期三

Preparation of concrete mixing plan

Concrete mixing plant is measured by the raw materials, weighing ratio later, after mixing through the mixer, after all, made of concrete equipment. Made of concrete for bridges, roads, construction and other projects to meet our needs. Therefore, the accurate use of concrete mixing plant is very important.
First, determine the occasion
Concrete mixing station in the station before the first first to determine the occasion, followed by a good occasion to plan to determine the needs of self-built concrete mixing station type, once again based on the Hongbin company supply the basic map of concrete infrastructure equipment The plan. Transport routes, raw material placement, console, dormitory plan, etc. must be determined early.
Second, the supply of water and electricity
Before the arrival of the concrete mixing station equipment, first pull the electricity, repair the pool. Under normal circumstances the concrete mixing station voltage is industrial electricity (380V). Ready to do the job in the future to ensure that the concrete mixing station equipment arrived at the occasion to be active equipment and equipment, good activity into production.
Third, the inspection of raw materials
The raw material of the concrete mixing plant usually refers to sand (coarse sand, fine sand), stone (stone, stone, small stone), cement and so on. Before the station to take the acquisition of raw materials, raw materials arrived at the occasion, to be seriously checked. Because only qualified raw materials to ensure that the quality of concrete labels. The following are the same as the .
www.t-batching-plant.com

2017年5月16日星期二

Check the preparation of the screw conveyor

Screw conveyor for the concrete mixing station cement warehouse dedicated conveyor equipment, is also very important mixing station auxiliary equipment, although the screw conveyor is not used, but we can not ignore the protection of its work, it appears to us when the problem To a lot of trouble we know that if you do not want to let the cement in the transport problems, we need to do the following:
1. Before using the first need to check the need to add or replace the lubricant where the screw conveyor is small, but need to add a lot of lubricant, but a lot, so to check it;
2. Before use to clean up the machine to ensure that the entire machine clean;
3. Check the various fastening parts to see if loose, if loose, immediately tightened;
4. Check the spiral blade, screw shaft, sliding bearings and other parts prone to failure to ensure that these parts are intact; (pay special attention to check the spiral blade wear, spiral leaves more easily wear, if serious, then you need to change the new, To avoid the use of the process of failure.)
5. Check the screw conveyor reducer whether there is oil spill, and then see its clean up;
6. Before use in the air machine test run, in the test run to pay attention to the various parts to see if there are abnormal phenomena, or a strange sound. The following are the same as the.
www.t-batching-plant.com

2017年5月15日星期一

The concrete batching machine is installed using common sense

1, concrete batching machine should be installed in a solid bench. When the long-term fixed, should be embedded anchor bolts; in the short term use, should be laid in the base of the pillow and leveling stable. The following are the same as the "
2, the concrete batching machine console, the operator should be able to see the work of the various parts of the situation. Electric control machine console, should be padded with rubber sheet or dry wood. The following are the same as the "
3, the motor and electrical components of the wiring is firm, to protect the zero or grounding resistance in line with regulations. The following are the same as the "
4, before the operation should be hopper to enhance the test, should observe and confirm the clutch, brake flexible and reliable. The following are the same as the "
5, the transmission, work devices, brakes, etc. are fast and reliable, open gear, pulley, etc. are protective cover. The following are the same as the "
6, you use the concrete batching machine operation, the mixer should be fully cleaned; when the operator needs to enter the tube, you must cut off the power or remove the fuse, lock the switch box, put on "no closing" signs, and Clean the workplace, cut off the power, lock the switch box.
www.t-batching-plant.com