1, mechanical and electrical charge should be opened every day before the guidance, inspection, supervision, the driver of the equipment "cross operation." In particular, pay attention to equipment belt correction, measuring the pressure sensor clean.

2, in case of continuous casting large volume of concrete components required for watering. To the equipment for special process control, development of appropriate equipment emergency measures.

(1) prone to failure of the site to focus on maintenance, and to ensure that the appropriate parts reserves;

(2) contact with the power supply department to provide a reliable power guarantee;

(3) to maintain a good state of standby generators;

(4) good maintenance, ready for concrete transport vehicles (to do a little surplus). The device ready message can only be submitted to the dispatcher when the device is ready.

3, the mixing station should be equipped with two hydraulic pipes for concrete transport vehicles in the event of failure, the use of other power to the concrete tank unloading. Appropriate spare picks, timely removal of concrete mixing tank solidified concrete tank. Equipment maintenance, adjustment, maintenance, clean-up, you must cut off the total power switch, and hang the "maintenance, non-closing" warning signs.

4, concrete mixing station electric control equipment, high technical content, should be equipped with an experienced electrician, is responsible for the daily maintenance of electrical equipment.
Concrete mixing equipment purchase should consider these factors:

(1) \ production scale

According to the size of the production scale to determine the capacity of concrete mixing equipment. The annual output of 200,000 m3, the annual output of 200,000 m3 the following, concrete mixing equipment productivity is generally not less than 90m3 / h; annual output of 200,000 to 300,000 m3, concrete mixing equipment productivity is generally 120m3 / h; annual output of 300,000 m3 or more, concrete mixing equipment productivity Is 150m3 / h or 200m3 / h.

(2), the construction site

According to the size of the construction site, you can choose concrete mixing plant or concrete mixing plant. Selection of concrete mixing station, aggregate to be upgraded twice, flexible layout, manufacturing, installation cycle is short, one-time investment costs low.

(3), concrete mixing equipment technical performance

Mainly from the advanced equipment, reliability, excellent and versatile several considerations. Also requires concrete mixing equipment, high precision, good mixing quality, high production efficiency, low energy consumption.

(4), character ratio

It is not advisable to pursue the technical performance of the equipment comprehensively, it will increase the unnecessary investment, but it is not advisable to pursue the low investment to reduce the technical performance of the equipment and bring the increase of the cost. More reasonable approach is to choose the appropriate cost performance.

In other words, when we choose concrete mixing equipment, according to local conditions, according to the size of the venue, the scale of production needs to select the price of the product. Can not blindly pursue quality, can not blindly pursue low prices.


Zhengzhou Xinfeng Machinery Co., Ltd. Main concrete mixer, concrete mixing station, stabilized soil mixing station, concrete batching machine, concrete conveying equipment, please call to discuss!