Maintenance of concrete mixing plant

Maintenance of concrete mixing plant
1, see the smooth oil within the blender oil cups.
2, once a week to see the oil mist of a high degree of timely filling.
3, once a day, open the water valve, the air compressor and gas tank condensed water discharged.
4, some bolts and nuts should always check is not loose, timely tightening.
5, water supply, gas, admixture system and the equipment is not normal.
6, check the electrical control system and the instrument is not normal.
7, see the concrete mixer of the mixing shaft and simplified cleaning is not clean. If the agglomeration of the agglomeration of concrete too much, it is necessary to manually enter the finishing.
8, regular finishing may change the cement warehouse filter in the filter.
9, regular finishing the host dust pipe in the residual powder, to prevent blocking.