Concrete mixing plant daily inspection work

Concrete mixing plant daily inspection work
irst, check the rotation of the lubrication point of the work of the situation, timely supply of lubricants.
Second, check the lubricating oil within the lubricating oil pump, timely supply of lubricants.
Third, a weekly check the gas system on the oil mist on the oil level, the use of viscosity of 2.5 ~ 70 E of lubricants.
Fourth, open a drain valve every day, the air compressor and gas tank condensed water discharge.
Fifth, fasteners (such as bolts and nuts) to always check whether loose, found to be loose, you must tighten in time, especially some of the variable load by the parts.
6, often check the water supply, gas supply and admixture system of the equipment is normal.
7, check the electrical control system and the instrument is normal.
8. Check whether the mixing shaft and the cylinder of the mixer are clean and clean. If the concrete is condensed on the stirring shaft, it must be manually cleaned.
9. Regularly clean or replace the filter in the powder tank filter.
10, if the shutdown time more than a week or more, you must vent the material within the bucket (such as cement, water, admixture and a variety of aggregate), and cleaning the mixing host, hopper, etc., to avoid material compaction.