Concrete mixing plant shutdown operation

Concrete mixing plant stop operation steps:
1, after the operation, should be cleaned mixing tube, the material door and hopper, and rinse with water, while washing the additive and supply system. Weighing system of the knife, knife edge should be clean, and should ensure that the weighing accuracy.
2, the frozen season, should be put out of the pump, additive pump, water tank and additives tank of water, and should start the pump and additive pump running a minute or two.

3, when the mixing station to transfer or disable, the tank should be, additive box, cement, sand, stone storage hopper and weighing the material within the bucket net, and clean. In the transfer, the lever should be fixed on the balance head, the sensor should be unloaded.