Common Faults in Concrete Mixing Plant

1, cement scales are not allowed to weigh
The failure of the performance of the scale after the calibration can show the correct value, the figures are not zero after unloading, clear and then load the weight of digital changes, but check the sensor resistance in the normal range, and the instrument no problem.
Analysis of the reasons may be: transport with a fixed scale frame angle iron is not removed; pressure head and pressure plate at the card; scale body and the outside world interfere with each other; 3 sensor models do not match;
If the pressure head or pressure plate issuance, should be promptly dealt with, so smooth and no resistance; if the scale body and the outside world interfere with the operation of the concrete mixing station, if the scale is not removed, , Should be promptly isolated; if the three sensor models do not match, the sensor should be replaced by the same model; if the material partial load, should be adjusted.
2, when the hopper does not have the material hopper gate to open and close the difficulty
The failure of the slow performance of the cylinder action, but check the mechanical part of the unloading door without friction, stuck phenomenon, and the solenoid valve, the cylinder is no leakage phenomenon.
Analysis of the reasons may be: poor air, such as gas at the Sanlian the gas-water separator filter too dirty, resulting in poor airway, so that gas flow per unit of time reduced, resulting in slow cylinder activity; muffler dirty, Cylinder action rod chamber and rodless cavity pressure difference becomes smaller, resulting in slow cylinder action.
Handling concrete mixing station failure method is: If the gas path is not smooth, it is timely to clean or replace the filter; if the muffler too dirty, it is timely cleaning muffler.
3, the discharge port is not expected
The failure in the contactor pull, the motor clockwise rotation, the mother screw conveyor discharge port is not expected, a little longer time the air switch will trip; the air switch will start after closing the motor tripping, observation powder No solidification phenomenon.
Analysis of possible reasons: the mother machine for the reverse; air switch damage; mother motor wiring may have a poor contact.
If the air switch is damaged, it should be replaced; if the mother machine motor wiring has a bad contact, should be checked and dealt with. If the machine is not connected to the motor, the motor should be connected to the motor.
4, stirring shaft "boring car"
The performance of the failure of the mixing host in the mixing mortar, the mixing shaft rotation difficult, or even stop.
The mixing blade or the side of the blade and the inner wall of the tank larger gap, a foreign body into the intervening between the card; voltage is too low; mixing parameters of the mixing of the two parts of the material; Setting error.
Handling concrete mixing station failure method is: If the serious overload, material hoop axis, should adjust the stirring capacity, timely cleaning of the solidified mortar; if the human error caused by the second feeding, the excess material should be removed according to the process operation; The blade and the liner should be adjusted so that the gap is not greater than 5mm, and promptly clean up the foreign body; if the voltage is too low, to the operator to re-scale; if the mixing blades or side vane and the tank wall between the foreign body stuck, Re-check the line voltage; if the parameter is set incorrectly, should be carefully checked the appropriate batching data and timely amendments.
5, the host discharge gate can not be opened
The failure of the performance of the mixing station when the automatic work, the host discharge gate does not open, stirring when the discharge indicator does not shine.
Analysis of the reasons may be: discharge doors and sealing plate between the foreign body or the accumulation of material; gas system pressure is insufficient, the cylinder leakage or damage to the oil mist; solenoid valve and the wiring between the relay off, virtual or relay damage; Solenoid valve coil burning or stuck card; time relay damage, resulting in no normal PLC input signal.
Handling concrete mixing station failure method is: If the discharge door and seal plate between the foreign body or accumulate material, should clean up the foreign body, the accumulation of materials and flushing discharge gate; if the gas system pressure, the cylinder leakage or damage to the oil mist , Should check the oil mist, fittings, cylinder and other parts are damaged; if the solenoid valve and the relay wiring between the loss, virtual connection or relay damage should check the relay contact output and wiring, if necessary, replacement; if the solenoid valve coil burn Damage or spool stuck, should replace the solenoid valve; if the time relay damage, it should be replaced.
6, conveyor belt deviation
The failure of the performance of three kinds of conditions: First, the conveyor belt in the case of no-load and load to the same side of the deviation, the conveyor belt centerline sideways deviation, the conveyor belt less side of the material bias; Right deviation and no fixed direction; Third, the conveyor belt conveyor belt in the central deviation.


Uneven foundation, flat roller adhesive material, uneven around the groove roller and the main and passive roller unbalanced adjustment will cause the conveyor belt deviation. If the conveyor belt in the case of no-load and load to the same side of the deviation, indicating that the conveyor belt on both sides of the tightness is not the same or rack rugged. At this point, you should first leveling the base of the rack, remove the adhesive on the flat roller, adjust the tensioning screw or weight. If the conveyor belt left and right deviation without a fixed direction, then the conveyor belt relaxation, should adjust the tensioning mechanism. If the conveyor belt in the middle of the conveyor deviation can be adjusted by adjusting the position of the roller group to correct, as shown in Figure 1.
Adjustment method: If the conveyor belt to one side, the side of the side of the roller conveyor belt to move forward direction, the other side of the roller group can also be moved back (or the other side of the roller bracket appropriate height) . The return roller group is the same as the load roller group adjustment method. For long conveyor systems, it is very effective to adjust the idlers.
Adjustment to the drum adjustment is an important part of conveyor belt deviation adjustment, the drum installation location must be perpendicular to the conveyor conveying the direction of the center line, or inevitable deviation. As shown in Figure 2, if the conveyor belt to its right deviation, it should be the right side of the bearing seat forward (or the left bearing seat back); If the conveyor belt to the left side of the drum deviation, should Move the bearing on the left side forward (or the right bearing seat rearward).

If the conveyor belt relative to the driven roller deviation, adjust the method and active drum just the opposite.

Zhengzhou Xinfeng Machinery Co., Ltd. Main concrete mixer, concrete mixing station, stabilized soil mixing station, concrete batching machine, concrete conveying equipment, please call to discuss!