2016年10月25日星期二
Concrete Mixer Installation Method
1, the mixer should be set in a flat position, with square wooden pad from the front and rear axles, the tire placed overhead, so as not to move when moving.
2, the mixer should be implemented two leakage protection, power supply connected to work before, you must carefully check the empty car try to pass that can be used. Test run should check the speed of mixing tube is appropriate, under normal circumstances, the empty car speed proportion of vehicles (after loading) slightly faster 2 to 3 turn, such as more difference should be adjusted wheel and transmission wheel ratio.
3, the rotation direction of the mixing tube should be consistent with the direction of the arrow, if not true, should correct the motor wiring.
4, check the transmission clutch and brake is flexible and reliable, whether the damage to steel wire rope, track pulley is good, around the barrier-free and lubrication of various parts of the situation.
5, boot, always pay attention to the operation of various parts of the mixer is normal. Shutdown, often check whether the mixer blade bending, whether the screw hit or loose.
6, when the concrete mixing is completed or is expected to stop 1h or more, in addition to the remaining material out of the net, the application of stones and water into the shaker, the boot rotation, the stick on the barrel of the mortar rinse off all discharged. There shall be no water in the cylinder to prevent the barrel and the blade from rusting. At the same time should also be cleaned outside the mixing tube fouling, so that machinery to keep clean and intact.
7, after get off work and shut down when not in use, should be cut off power, and lock the switch box to ensure safety
Zhengzhou Xinfeng Machinery Co., Ltd. Main concrete mixer, Concrete mixing plant, stabilized soil mixing station, concrete batching machine, concrete conveying equipment, please call to discuss!
订阅:
博文评论 (Atom)
没有评论:
发表评论