1, mechanical and electrical charge should be opened every day before the guidance, inspection, supervision, the driver of the equipment "cross operation." In particular, pay attention to equipment belt correction, measuring the pressure sensor clean.

2, in case of continuous casting large volume of concrete components required for watering. To the equipment for special process control, development of appropriate equipment emergency measures.

(1) prone to failure of the site to focus on maintenance, and to ensure that the appropriate parts reserves;

(2) contact with the power supply department to provide a reliable power guarantee;

(3) to maintain a good state of standby generators;

(4) good maintenance, ready for concrete transport vehicles (to do a little surplus). The device ready message can only be submitted to the dispatcher when the device is ready.

3, the mixing station should be equipped with two hydraulic pipes for concrete transport vehicles in the event of failure, the use of other power to the concrete tank unloading. Appropriate spare picks, timely removal of concrete mixing tank solidified concrete tank. Equipment maintenance, adjustment, maintenance, clean-up, you must cut off the total power switch, and hang the "maintenance, non-closing" warning signs.

4, concrete mixing station electric control equipment, high technical content, should be equipped with an experienced electrician, is responsible for the daily maintenance of electrical equipment.